Milestones across the Copperbelt.

Real jobs, real numbers — from a system that's the first of its kind in Zambia, to fabrication worth over $150,000 built in our own workshop.

Dust suppression microfog system at Luanshya Copper Mines Luanshya Copper Mines PLC
Milestone

The first dust suppression system of its kind in Zambia.

Instead of extracting dust, this system suppresses it — increasing its weight with microfog so it falls back onto the original material. The estimated saving was alarming: a good $380,000 saved annually. Alongside that, we achieved 112 ppm in dust concentration, comfortably inside the statutory allowable limit of 350 ppm.

The system passed mine safety and Bureau of Standards testing. A 22kW auxiliary Master-Vac unit supports it — picking up spillages, throwing them onto a conveyor, offloading during system faults, and rerouting material to any selected area. It saves around 1 ton of ore daily, previously lost as sweepings, with no downtime needed for housekeeping.

$380,000saved annually
112 ppmachieved vs. 350 ppm allowed
1 ton/dayore recovered via Master-Vac
Bulk material handling equipment for Konkola Copper Mines Konkola Copper Mines PLC
Milestone

Bulk material handling — two Master-Vac systems.

Two state-of-the-art vacuum delivery systems, capable of offloading and transferring material of diverse sizes and risks.

The E55 Master-Vac serves the Tailings Leach Plant, offloading powder quick lime and pebble lime, and handling housekeeping. It eliminates the use of an old tippler, conveyors and bucket elevators that were too old to maintain. Replacing all components of the old system would have cost around $1,200,000 — our solution costs a quarter of that, installs without downing tools, and saves as much as $20,000 monthly. Return on investment: about 6 months.

The E75 Master-Vac serves the Smelter Division, coupled with road transport to keep concentrate supply efficient. It eliminates dependence on rail transport and the old tippler, cuts the use of a wasteful front-end loader, and reduces the daily wastage of about 5 tons of concentrate (valued at roughly $1,500). It offloads 75 tons per hour — matched to a 450-ton daily consumption.

$20,000/mosaved, E55 system
6 monthsreturn on investment
75 t/hroffload rate, E75 system
Mechanical demolition works at Bwana Mkubwa Bwana Mkubwa → Kansanshi Mine
Milestone

Full plant demolition and re-installation.

LOMA carried out the mechanical demolition of a belt filter plant at Bwana Mkubwa, then transported and re-installed the same plant at Kansanshi Mine in Solwezi — a complete end-to-end mechanical relocation, handled by our own crews.

Conveyor shortening and diverter chute fabrication at Mopani Mopani Copper Mines — SOB Shaft
Milestone

Conveyor works & a $150,000 diverter chute.

Beyond installing a dust suppression system at Mopani's SOB Shaft, we successfully shortened a belt conveyor at the concentrator, and fabricated a diverter chute at our own workshop — a job worth over $150,000, delivered without outsourcing a single component.

$150,000+diverter chute, workshop-built
More From The Field

Civil, mechanical & waste-management works.

Civil works construction on the Copperbelt

Civil Works

Structural and civil works carried out alongside our mechanical fabrication teams, supporting plant upgrades and new installations.

Waste management and dust control operations

Waste Management & Dust Control

Ongoing suppression and material-handling support that keeps concentrators and shafts running within statutory dust limits.

Locomotive spares and repair

Locomotive Repair Kits

Full engine and transmission repair kits supplied for both electrical and diesel locomotives, expedited to meet breakdown situations.

Bring us a job with real numbers to hit — we'll show you ours.